BNSF BYPASS TRAINS JUNE 2013


4345 South crossing Castle Creek
(PRINT# BNSFBP-1)

From June 15, 2013 through June 23, 2013 the BNSF ran bypass trains from their Highline while tie replacement work was being done on UP's Summit Tunnel on Donner Pass. UP trains were diverted to the Feather River Canyon so to ease the strain BNSF trains were rerouted through Dunsmuir. Here are photos of some of the trains that passed through here during that time period.


(CLICK FOR ORDERING INFORMATION)


BNSFBP

    1. 4345 South crossing Castle Creek (Sample Above)
    2. 4111 South just south of the Dunsmuir Yard
    3. 4111 South crossing Salt Creek Trestle
    4. 4505 North arriving at Dunsmuir
    5. 4505 North crew change
    6. 4505 North ready to leave Dunsmuir
    7. 4505 North at the North Switch Dunsmuir
    8. 4505 North at the South Switch of Mott
    9. 4505 North at the South Switch of Mott
    10. 7312 South leaving Dunsmuir
    11. 7312 South leaving Dunsmuir
    12. 7312 South at Sweetbrier Ave.
    13. 7312 South at Sims Siding
    14. 754 North crossing Castle Creek
    15. 754 North crossing Castle Creek
    16. 754 North in Castle Crags Siding
    17. 754 North along the Sacramento River at Shasta Retreat
    18. 754 North near Mt Shasta City
    19. 4707 South crossing Castle Creek
    20. 4707 South along the Sacramento River at Gibson
    21. 4707 South crossing Salt Creek Trestle
    22. 4995 North in Dunsmuir Yard waiting for UP Z Train
    23. 4995 North crew giving roll by for UP Z Train
    24. 4995 North leaving Dunsmuir Yard
    25. 4995 North passing Mt Shasta at Cougar
    26. 4614 North rolling through Black Butte
    27. 4614 North at Black Butte with CN power in consist

(Return to BNSF Page)